Skip Navigation

Appendix A: Performance and Resource Tables

 

STRATEGIC OBJECTIVE 3.2

Enhance the conservation and management of coastal and marine resources to meet America’s economic, social, and environmental needs

OBJECTIVE 3.2 RESOURCES
(Dollars in Millions)
  FY 2000
Actual
FY 2001
Actual
FY 2002
Actual
FY 2003
Actual
FY 2004
Actual
FY 2005
Actual
FY 2006
Actual
FY 2007
Actual
Total Funding $978.1 $1,640 $1,584.1 $1,576.5 $1,461.3 $1,554.5 $1,758.0 $1,597.7
FTE – Full-Time Equivalent 4,040 4,783 3,984 4,365 4,327 4,228 4,444 3,720

 

PERFORMANCE OBJECTIVE: Protect, restore, and manage the use of coastal and ocean resources through an ecosystem approach to management (NOAA)

PERFORMANCE OBJECTIVE RESOURCES
(Dollars in Millions)
  FY 2000
Actual
FY 2001
Actual
FY 2002
Actual
FY 2003
Actual
FY 2004
Actual
FY 2005
Actual
FY 2006
Actual
FY 2007
Actual
Total Funding $873.6 $1,504 $1,334.2 $1,314.9 $1,268.5 $1,379.5 $1,559.3 $1,418.3
FTE – Full-Time Equivalent 3,233 3,913 3,042 3,361 3,611 3,479 3,670 3,029

NOAA PERFORMANCE MEASURE
MEASURE: Number of protected species designated as threatened, endangered, or depleted with stable or increasing population levels
Year Status Actual Target
FY 2007 Green (Met target) 261 26
Year Status Historical Results Historical Target
FY 2006 Green (Met target) 26 24
FY 2005   24 New—no target to measure against
1 Projected. Final – December 2007. (back)

NOAA PERFORMANCE MEASURE
MEASURE: Number of habitat acres restored (annual/cumulative)1
Year Status Actual Target
FY 2007 Green (Met target) 5,974 / 38,488 5,000 / 37,514
Year Status Historical Results Historical Target
FY 2006 Blue (Exceeded target) 7,598 / 32,514 4,500 / 29,416
FY 2005 Blue (Exceeded target) 8,333 / 24,916 4,500 / 21,083
FY 2004 Blue (Exceeded target) 5,563 / 16,583 3,700 / 14,780
FY 2003 Blue (Exceeded target) 5,200 / 11,020 2,829
FY 2002   New—no target to measure against  
1 Determination of whether target was met or exceeded is based on annual amount since that is what was done in that year. (back)

NOAA PERFORMANCE MEASURE
MEASURE: Cumulative number of coastal, marine, and Great Lakes issue-based forecasting capabilities developed and used for management
Year Status Actual Target
FY 2007 Green (Met target) 35 35
Year Status Historical Results Historical Target
FY 2006 Green (Met target) 31 31
FY 2005   New—no target to measure against  

NOAA PERFORMANCE MEASURE
MEASURE: Annual number of coastal, marine, and Great Lakes ecological characterizations that meet management needs
Year Status Actual Target
FY 2007 Green (Met target) 27 27
Year Status Historical Results Historical Target
FY 2006 Green (Met target) 62 53
FY 2005   New—no target to measure against  

NOAA PERFORMANCE MEASURE
MEASURE: Annual number of coastal, marine, and Great Lakes habitat acres acquired or designated for long-term protection
Year Status Actual Target
FY 2007 Green (Met target) 2,0001 2,000
Year Status Historical Results Historical Target
FY 2006 Blue (Exceeded target) >86M2 200,137
FY 2005   New—no target to measure against  
1 Estimate. Final – December 2007. (back)
2 The large FY 2006 actual reflects the new Northwest Hawaiian Islands Marine National Monument. (back)

NOAA PERFORMANCE MEASURE
MEASURE: Fish stock sustainability index (FSSI)1
Year Status Actual Target
FY 2007 Green (Met target) 5162 505
Year Status Historical Results Historical Target
FY 2006   501.0  
FY 2005   481.5  
FY 2004   456  
1 NOAA only recently developed the FSSI and therefore didn’t have any targets prior to FY 2007. NOAA did, however, have data from which they could derive the FSSI index for FY 2004 - FY 2006. (back)
2 Projected. Final – December 2007. (back)

NOAA PERFORMANCE MEASURE
MEASURE: Percentage of living marine resources (LMR) with adequate population assessments and forecasts
Year Status Actual Target
FY 2007 Green (Met target) 40.71 40
Year Status Historical Results Historical Target
FY 2006 Green (Met target) 38.8 New - no target to measure against
FY 2005   37.5  
1 Projected. Final – December 2007. (back)

NOAA PERFORMANCE MEASURE
MEASURE: Percentage of tools, technologies, and information services that are used by NOAA partners/customers to improve ecosystem-based management
Year Status Actual Target
FY 2007 Green (Met target) 85 85
Year Status Historical Results Historical Target
FY 2006   New - no target to measure against  

 

PERFORMANCE OBJECTIVE: Support the Nation’s commerce with information for safe, efficient, and environmentally sound transportation (NOAA)

PERFORMANCE OBJECTIVE RESOURCES
(Dollars in Millions)
  FY 2000
Actual
FY 2001
Actual
FY 2002
Actual1
FY 2003
Actual1
FY 2004
Actual1
FY 2005
Actual
FY 2006
Actual
FY 2007
Actual
Total Funding $104.5 $136.0 $249.9 $261.6 $192.8 $175.0 $198.7 $179.4
FTE – Full-Time Equivalent 807 870 942 1,004 716 749 774 691
1 In the FY 2004 PAR, the 2002-2004 amounts for the mission support objective were distributed among the four objectives. In this PAR, the 2002-2004 mission support levels were separated out resulting in lower 2002-2004 levels than as reported in the FY 2004 PAR for the other four objectives. (back)

NOAA PERFORMANCE MEASURE
MEASURE: Reduce the hydrographic survey backlog within navigationally significant areas (square nautical miles surveyed per year)1
Year Status Actual Target
FY 2007 Blue (Exceeded target) 3,1982 1,350
Year Status Historical Results Historical Target
FY 2006 Green (Met target) 2,851 2,500
FY 2005 Green (Met target) 3,079 2,700
FY 2004 Red (Did not meet target) 2,070 2,290
FY 2003 Red (Did not meet target) 1,762 2,100
FY 2002   1,514  
FY 2001   2,963  
FY 2000   1,557  
1 Prior to FY 2003, NOAA’s targets were in the form of percent reduction, not miles. NOAA changed this methodology in FY 2003, but had actual data (shown here) back to FY 2000. (back)
2 Estimate. Final – December 2007. (back)

NOAA PERFORMANCE MEASURE
MEASURE: Percentage of U.S. counties rated as fully enabled or substantially enabled with accurate positioning capacity
Year Status Actual Target
FY 2007 Green (Met target) 51.6% 49.0%
Year Status Historical Results Historical Target
FY 2006 Green (Met target) 43.3% 39.0%
FY 2005 Green (Met target) 32.2% 28.0%
FY 2004   New—no target to measure against  

NOAA PERFORMANCE MEASURE
MEASURE: Aviation forecast accuracy of ceiling/visibility (1 mi/500 feet to less than 3 mi/1,000 feet)(%) 1, 2, 3
Year Status Actual Target
FY 2007 Green (Met target) 62% 62%
Year Status Historical Results Historical Target
FY 2006 Red (Did not meet target) 43% 47%
FY 2005 Green (Met target) 46% 46%
FY 2004 Yellow (Slightly below target) 45% 46%
FY 2003 Green (Met target) 48% 45%
FY 2002 Red (Did not meet target) 13% 18%
FY 2001 Red (Did not meet target) 18% 21%
FY 2000 Red (Did not meet target) 15% 20%
1 Prior to FY 2007, this measure was known as “Accuracy (%) of forecasts of ceiling and visibility (aviation forecasts).” (back)
2 From FY 2000 - 2002, NOAA used a different method to calculate accuracy - targets were significantly lower than the current method. (back)
3 For FY 2007, the aviation measures were redefined to cover the entire IFR (Instrument Flight Rule) airspace instead of the limited IFR range of 5,000 feet to three miles. This change was to increase the usefulness of the measure to the general and commercial aviation communities. This change required the measures to be re-baselined. While the numbers for accuracy and FAR appear to be reversed when comparing FY 2006 to FY 2007, they are actually measuring different things. (back)

NOAA PERFORMANCE MEASURE
MEASURE: Aviation forecast FAR for ceiling/visibility (1 mi/500 feet to less than 3 mi/1,000 feet) (%) 1, 2, 3
Year Status Actual Target
FY 2007 Green (Met target) 40% 45%
Year Status Historical Results Historical Target
FY 2006 Green (Met target) 64% 65%
FY 2005 Green (Met target) 63% 68%
FY 2004 Green (Met target) 65% 70%
FY 2003 Green (Met target) 64% 71%
FY 2002 Green (Met target) 58% 52%
FY 2001 Green (Met target) 51% 51%
FY 2000 Red (Did not meet target) 53% 50%
1 Prior to FY 2007, this measure was known as “False alarm rate (FAR)(%) of ceiling and visibility (aviation forecasts).” (back)
2 From FY 2000 - 2002, NOAA used a different method to calculate false alarm rate - targets were significantly lower than the current method. (back)
3 For FY 2007, the aviation measures were redefined to cover the entire IFR (Instrument Flight Rule) airspace instead of the limited IFR range of 5,000 feet to three miles. This change was to increase the usefulness of the measure to the general and commercial aviation communities. This change required the measures to be re-baselined. While the numbers for accuracy and FAR appear to be reversed when comparing FY 2006 to FY 2007, they are actually measuring different things. (back)

NOAA PERFORMANCE MEASURE
MEASURE: Marine wind – percentage of accurate forecasts (%) 1, 2
Year Status Actual Target
FY 2007 Green (Met target) 73%3 68%
Year Status Historical Results Historical Target
FY 2006 Red (Did not meet target) 55% 58%
FY 2005 Green (Met target) 57% 57%
FY 2004 Green (Met target) 57% 57%
FY 2003 Green (Met target) 57% 54%
FY 2002 Green (Met target) 53% 53%
FY 2001 Yellow (Slightly below target) 52% 53%
FY 2000 Green (Met target) 51% 51%
1 Prior to FY 2007, this measure was known as “Marine wind speed accuracy (%).” (back)
2 From FY 2000 - 2002, this was combined with “Marine Wave height accuracy.” (back)
3 Projected. Actuals through August 2007. (back)

NOAA PERFORMANCE MEASURE
MEASURE: Wave heights – percentage of accurate forecasts (%) 1, 2
Year Status Actual Target
FY 2007 Green (Met target) 78%3 73%
Year Status Historical Results Historical Target
FY 2006 Green (Met target) 70% 68%
FY 2005 Green (Met target) 67% 67%
FY 2004 Red (Did not meet target) 67% 69%
FY 2003 Green (Met target) 71% 66%
FY 2002   New—no target to measure  
1 Prior to FY 2007, this measure was known as “Marine wave height accuracy (%).” (back)
2 From FY 2000 - FY 2002, this was combined with “Marine wind speed accuracy. “ (back)
3 Projected. Actuals through August 2007. (back)

 

MISSION SUPPORT OBJECTIVE: Provide critical support for NOAA’s mission (NOAA)1

PERFORMANCE OBJECTIVE RESOURCES
(Dollars in Millions)
  FY 2000
Actual
FY 2001
Actual
FY 2002
Actual
FY 2003
Actual
FY 2004
Actual
FY 2005
Actual
FY 2006
Actual
FY 2007
Actual
Total Funding     $313.5 $250.5 $1,217.6 $1,354.5 $1,584.0 $1,564.1
FTE – Full-Time Equivalent     1,716 1,996 2,178 2,437 2,880 3,048

 

1 There are no GPRA measures for the Mission Support objective since the activities of this objective support the outcomes of the four other NOAA objectives. (back)


Previous Page | Next Page